Change connection sequence in wire-chain

<< Click to Display Table of Contents >>

Navigation:  Wire-list Editor > Wire-list Editor main dialogue > Context menu >

Change connection sequence in wire-chain

Previous pageReturn to chapter overviewNext page
Figure 1821: The "Change connection sequence in wire-chain" command

Figure 1821: The "Change connection sequence in wire-chain" command

 

You can re-route the wiring order in a sub-node (a wire-chain), for example if the result of the optimisation that cadett ELSA has made is not satisfying. Doing so is called to Change connection sequence in wire-chain.

 

Please refer to the Change sequence topic where this feature is described.